G1 : Advanced Networking Protocol Workshop : Différence entre versions
De Wiki de Projets IMA
(→Materials used for the specific task) |
(→Materials used for the specific task) |
||
Ligne 6 : | Ligne 6 : | ||
=== Task overview === | === Task overview === | ||
=== Materials used for the specific task === | === Materials used for the specific task === | ||
− | *Switch | + | *Layer-3 Switch : Cisco Catalyst 3560-E |
*PC with serial connection | *PC with serial connection | ||
== Workshop progress == | == Workshop progress == | ||
=== 1<sup>st</sup> week (01/10/2015) === | === 1<sup>st</sup> week (01/10/2015) === |
Version du 4 octobre 2015 à 20:17
The main aim of this workshop is to realize a redundant network infrastructure to ensure maximum availability in case of a device or path failure. The architecture of the network is shown in the diagram given below.
Sommaire
Scope statement for the specific task
Task overview
Materials used for the specific task
- Layer-3 Switch : Cisco Catalyst 3560-E
- PC with serial connection